All elements of the system must be included in the system at the time of influent introduction. No pouring or adding of any material/chemical should be done during the influent pour time. |
|
|
137days since 144days since 142days since 111days since |
Can the hydrogen peroxide be added with the wastewater, or must it be part of the system at the close of the assembly hour?posted Mar 14, 2011, 4:50 PM by Justin Beutel [ updated Mar 14, 2011, 4:51 PM by Justin Beutel ]
|
Sign in|Recent Site Activity|Report Abuse|Print Page|Powered By Google Sites