137days since
Mailer #3 Confirmation Deadline (email)

144days since
Attendee PRE-Registration Deadline

142days since
Hotel Registration CUT OFF

111days since
2014 Mid-Pacific Student Conference

Past Conferences‎ > ‎2012‎ > ‎2012 Competitions‎ > ‎Water Treatment‎ > ‎FAQ‎ > ‎

If we attach a foot pump to our system during construction, when pouring the wastewater are we allowed to pump air into the water?

The foot pump may be used to pump air into the water when pouring but only during the 2-minute free period at the beginning of the 10-minute pouring period. Therefore, once the free period is over, teams are not allowed to do anything to the wastewater except pour the wastewater into their treatment systems.
Comments

Sign in|Recent Site Activity|Report Abuse|Print Page|Powered By Google Sites