137days since
Mailer #3 Confirmation Deadline (email)

144days since
Attendee PRE-Registration Deadline

142days since
Hotel Registration CUT OFF

111days since
2014 Mid-Pacific Student Conference

Past Conferences‎ > ‎2012‎ > ‎2012 Competitions‎ > ‎Water Treatment‎ > ‎FAQ‎ > ‎

Can chemical additives be measured out before the start of the construction phase, and added into the wastewater during the two minutes free interaction period?

Items that will be used in the free interaction period must be measured out and used in those first 2 minutes of the free interaction period.
Comments

Sign in|Recent Site Activity|Report Abuse|Print Page|Powered By Google Sites